Coastal Modern Living in Cardiff: Inside a Brand-New Tourmaline Build
In the heart of Cardiff-by-the-Sea, a new level of coastal luxury has arrived.
Located at 2262 Cambridge Avenue, this newly completed residence by award-winning builder Tourmaline offers a rare opportunity to own a thoughtfully designed, ground-up construction home in one of North County San Diego’s most sought-after beach communities.
Priced at $3,750,000, the home features 4 bedrooms, 5 bathrooms, and approximately 2,359 square feet of living space—all crafted with a focus on indoor-outdoor living, natural light, and elevated coastal design.
From expansive ocean views to a seamless main living area that opens onto a covered deck, every detail reflects the modern Southern California lifestyle. The home also includes an attached ADU, offering flexibility for guests, rental income, or multigenerational living.
What Makes Tourmaline Builds Stand Out
Tourmaline has built a strong reputation in coastal San Diego for delivering homes that balance architecture, function, and lifestyle.
This home is no exception.
Expect:
-
Clean, contemporary finishes
-
Open-concept living spaces
-
Thoughtful indoor-outdoor flow
-
High-end materials and energy-efficient systems
The result is a home that feels both luxurious and livable—designed not just to impress, but to be enjoyed daily.
How Long Does a New Build Like This Take?
One of the most common questions buyers ask is: how long does it actually take to build a home like this?
For a custom or semi-custom coastal build like this Tourmaline property, the timeline typically looks like:
1. Planning & Permits (6–12 months)
Before construction begins, developers must:
-
Secure architectural plans
-
Navigate coastal regulations and city approvals
-
Obtain permits
In areas like Cardiff, this phase can take longer due to zoning and coastal commission considerations.
2. Construction (10–18 months)
Once approved, the physical build begins:
-
Site prep and foundation
-
Framing and structural work
-
Mechanical systems (plumbing, electrical, HVAC)
-
Interior finishes and detailing
Homes like this—around 2,300+ sq ft with high-end finishes—generally fall into the 12–16 month range for construction alone.
3. Finalization & Delivery (1–3 months)
-
Inspections
-
Punch list items
-
Final staging and listing
Total Timeline: ~18 to 30 Months
From initial concept to completion, a home like this typically takes roughly 1.5 to 2.5 years to bring to market.
That’s what makes newly completed homes especially valuable—you skip the entire timeline, uncertainty, and construction process.